9
645 Mapleton Rd, Mapleton, ME 04757, USA
Mapleton, Maine 04757
+1 207-764-1857

In summary based on firsthand experience in realizing their very poor workmanship, Buyer Beware if you’re considering Buck Construction. The aforementioned amounts to negligence on the part of Buck Construction and is inexcusable.

When the roofers commenced with removing the existing roof, installed by Buck Construction in 2006, they realized many shortcuts that were taken during the installation that amount to negligence on the part of Buck Construction. All of which have been photographed, which I’d attach if the option on this site permitted. The list is as follows:

- There were many plywood pieces that had no nails, yes folks, 0 nails and slid right down the roof. The entire sub roofing (Plywood) roof was not properly nailed down and had to be addressed.

- Corners / Seams from the main roof to the dormers were overlapped incorrectly. This can result in Ice damming and making is way underneath the roofing tiles causing leaks.

- The open space at the peak of the roof for venting should be approximately 2” on either side of the roof pitch for venting. In this case it total space was approximately 9-10”.

- There is an upper and lower roof section and the lower roof had no water and Ice barrier installed as it should have given the weather conditions in the state of Maine. This resulted in plywood rotting and needing replacement.

- Tar paper under the roofing tiles was only applied in some locations, and much of the roofing tiles were placed directly on top of plywood.

- No flashing was installed on the roof returns. This resulted in rot and water leaks.

In 2006, Buck Construction constructed the newly built the home new we currently reside in. We have realized much in the way of negligence regarding their overall workmanship. The roof tiles are IKO Shingles and after 8 years, the 30 year shingles were cracking, curling, and nails were popping. As such, we were informed by several roofing professionals upon inspection, the 6.000+ SQFT roof was in need of a complete replacement.

Show Map

Buck Construction — General Contractor in Mapleton

We are glad to greet you!

Buck Construction

General Contractor at 645 Mapleton Rd, Mapleton, ME 04757, USA. Here you will find detailed information about Buck Construction: address, phone, fax, opening hours, customer reviews, photos, directions and more.

Rating

4
/
5
Based on 9 reviews

Contacts

Categories:
State:
Maine
Address:
645 Mapleton Rd, Mapleton, ME 04757, USA.
City:
Mapleton
Postcode:
04757

About Buck Construction

Buck Construction is a US General Contractor based in Mapleton, Maine. Buck Construction is located at 645 Mapleton Rd, Mapleton, ME 04757, USA.


Please contact with Buck Construction using information above: Address, Phone number, Fax, Postal code, Website address, E-mail, Facebook. Find Buck Construction opening hours and driving directions or map. Find real customer reviews and ratings or write your own review.

Are you the owner?
You can make a change to the page:
Edit this page

ALL reviews about Buck Construction

  • Robert
    Added 2016.09.10
    In summary based on firsthand experience in realizing their very poor workmanship, Buyer Beware if you’re considering Buck Construction. The aforementioned amounts to negligence on the part of Buck Construction and is inexcusable.
  • Alexis
    Added 2016.08.22
    When the roofers commenced with removing the existing roof, installed by Buck Construction in 2006, they realized many shortcuts that were taken during the installation that amount to negligence on the part of Buck Construction. All of which have been photographed, which I’d attach if the option on this site permitted. The list is as follows:
  • Diana
    Added 2016.06.06
    - There were many plywood pieces that had no nails, yes folks, 0 nails and slid right down the roof. The entire sub roofing (Plywood) roof was not properly nailed down and had to be addressed.
  • Mason
    Added 2016.04.03
    - Corners / Seams from the main roof to the dormers were overlapped incorrectly. This can result in Ice damming and making is way underneath the roofing tiles causing leaks.
  • Morgan
    Added 2016.03.15
    - The open space at the peak of the roof for venting should be approximately 2” on either side of the roof pitch for venting. In this case it total space was approximately 9-10”.
  • Destiny
    Added 2015.03.25
    - There is an upper and lower roof section and the lower roof had no water and Ice barrier installed as it should have given the weather conditions in the state of Maine. This resulted in plywood rotting and needing replacement.
  • Emily
    Added 2015.02.13
    - Tar paper under the roofing tiles was only applied in some locations, and much of the roofing tiles were placed directly on top of plywood.
  • Rebecca
    Added 2014.04.25
    - No flashing was installed on the roof returns. This resulted in rot and water leaks.
  • Faith
    Added 2013.08.03
    In 2006, Buck Construction constructed the newly built the home new we currently reside in. We have realized much in the way of negligence regarding their overall workmanship. The roof tiles are IKO Shingles and after 8 years, the 30 year shingles were cracking, curling, and nails were popping. As such, we were informed by several roofing professionals upon inspection, the 6.000+ SQFT roof was in need of a complete replacement.
Leave your own review about Buck Construction:
Add a review